HomeCOMPETITIONSMadrid Renove Río

Madrid Renove Río

PROJECT: Madrid Renovation River.
The Madrid Renovation River competition, organized by the Madrid Think Tank of the COAM (Official Association of Architects of Madrid), proposes the energy-efficient renovation of an 11-story, detached apartment building. The building was constructed in 1967.

The main objectives of the competition were:

  • Reducing the building's energy and water demand.
  • Meeting the resulting demand with minimal resource consumption.
  • Managing the operation and maintenance of the building to ensure maximum efficiency throughout its life cycle.

All proposed actions should have a maximum budget of €900,000, justifying the planned amount by chapter.

The building in its original state had the following energy consumption and CO2 emissions:

Primary Education Consumption E. Primary TOTAL CO2 emissions Qualification
(kWh/m2 year) (kWh year) (Kg/m2 year)

Heating

135,38

588.361,48

27,34

AND

Refrigeration

31,32

136.116,72

7,79

G

ACS

29,74

129.250,04

6,82

G

TOTAL

196,44

853.728,24

41,95

AND

Argola Arquitectos' improvements to energy efficiency in the building follow the Nearly Zero Energy Building (NZEB) philosophy and are briefly described below:

REDUCED DEMAND
  • Incorporation of Thermal Insulation: Adhesion of an external thermal insulation system (ETICS) of 15cm, composed of expanded polystyrene panels with a thermal conductivity of 0.037 W/mºk density and finished by means of a high performance thin layer mineral stucco reinforced by a fiberglass mesh.
  • Incorporation of Solar Protection: The incorporation of solar protections for the existing openings has been planned, both for the south orientation and for the sides (east and west).
FACILITY IMPROVEMENTS
  • Improvement of Lighting and Electrical Installations: The installation of lamps incorporating LED (Light Emitting Diode) is planned in the common areas of the building along with the placement of presence detectors that automatically activate the lights.
  • Specific improvements to the heating system: Installation of thermostatic radiator valves and their corresponding sensors. Automatic balancing valves are also included to ensure proper water balance in the heating system.
  • Relocation of Refrigeration Equipment: Homogenization of the facade by concealing the individual exterior air conditioning units, either behind slat walls or in facade boxes arranged for this purpose.
  • Boiler Replacement: Changing the current boiler for a gas-fired condensing boiler, with the resulting improvement in performance, placing it at 105% compared to the estimated 77% of the current boiler.
INCORPORATION OF RENEWABLE ENERGIES
  • Installation of Solar Thermal Collectors: Incorporation of an installation of vacuum tube solar thermal collectors for water heating, intended for domestic hot water consumption, located on the double south facade, inclined 90º with respect to the horizontal.
ACCESSIBILITY MEASURES
  • Access to the Property: Adaptation of the access portal to the current DB-SUA, with the incorporation of two ramps with an 8% slope.
  • Elevator Replacement: The current elevators are replaced with modern technology, with one adapted cabin and one conventional cabin.
Implementing these strategies will give the property a B rating, with a reduction in primary energy consumption equal to 74%, as described in the following table:
Primary Education Consumption E. Primary TOTAL CO2 emissions Qualification
(kWh/m2 year) (kWh year) (Kg/m2 year)

Heating

35,61

154.761,06

7,19

B

Refrigeration

11,15

48.457,90

2,77

D

ACS

4,76

20.686,96

1,09

TO

TOTAL

51,52

223.905,92

11,05

B

 

Place:
Madrid, Spain
Date:
27/02/2014
Customer:
Think Tank (COAM)
Date:

July 10, 2023

Category:
COMPETITIONS
Share:
Madrid River 9 Madrid River 8 Madrid River 7 Madrid River 6 Madrid River 5 Madrid River 4 Madrid River 3 Madrid River 2 Madrid River
CONTACT

MADRID OFFICE

Fuencarral Street, 123 Madrid, Spain 28010
Telephone: +34 91 446 69 81
Email: argola@argolaarquitectos.com

CHILE OFFICE

Avenida Alonso de Córdova 5870 OF 1417 PS 14, Las Condes, Metropolitan Region of Santiago, Chile
Telephone: +56 9 3446 5128

WORK WITH US >
LATEST ENTRIES
  • October 12 Hospital: history, evolution and expansion of one of Madrid's most emblematic hospitals
  • Integrated health centers: towards convergence between primary and hospital care
  • Hospital architecture facing the challenge of population aging
  • High-rise hospitals: challenges and solutions in vertical design
  • Designing hospitals using BIM methodology
© Copyright. All rights reserved. Árgola Arquitectos | Privacy Policy | Legal Notice | Cookie Policy | Accessibility Statement | Social Media Policy | Code of Conduct for Third Parties | Quality Policy | Developed by reload.